After bC Rohde 01

Love subway tile and need a little inspiration for your master bathroom? Then take a closer look at this beautiful, new, subway tile shower with pebble mosaic tiles on the shower floor.

The owners even added a stunning chandelier above the bathtub for an added touch of elegance to this bathroom renovation, what a nice touch!

But don’t just take our word on how well this job turned out.  Look below for the customer testimonial, project specifications and extensive before and after pictures!

The Homeowner’s bathCRATE Experience

What was your favorite part of the bathCRATE process?

Picking out materials with Lindsay and Willy was fun.

What was your favorite part about the bathCRATE team?

I cannot say enough about the team and their professionalism. They were on time every day. They cleaned up every afternoon before they left. And most importantly, they did a great job and were a lot of fun to work with. Everyone was terrific but I have to give a special shout out to Aaron, Ryan, Jim, Mark, and A.J. for all the hard work!

Before and After Pictures

(Click each image to enjoy a larger view.)

After bC Rohde 01  After bC Rohde 04  After bC Rohde 05After bC Rohde 02.1After bC Rohde 02After bC Rohde 08After bC Rohde 07 After bC Rohde 06  bC Rohde After Collage

Day by Day Bathroom Renovation Progress

(Note: We added a few extra days to our normal 7-day process to accommodate the owner-request add-ons.)

Day 1 – Day one of this bathroom renovation!  On this first day, we set up plastic walls to protect the home from dust, protected the path from the entry door to the bathroom with building paper, and then went to town removing the countertops, backsplash, shower tile, and tub surround.  Toward the end of the day we created the template for the new quartz countertops, which take a few days to fabricate off-site.

Days 2 & 3–  The electrical team began the wiring for the new lighting and a new shower valve was installed.

Day 4 – The bathCRATE team was back on site to patch and repair the sheetrock and the shower pan liner was installed.

Day 5 – All of the walls and ceiling in the bathroom were painted. Kelly-Moore Afternoon Tea with a satin finish was applied to the walls and the ceiling was painted to match the existing color.

Days 6, 7, & 8 –  The tile artisans were on site to install tile at the shower and tub surround. Bedrosians Traditions Iced White 4″ x 10″ gloss ceramic tiles with an accent of Bedrosians Kismet Zen mosaic tiles were installed at the shower walls and tub surround while the shower floor received Bedrosians Hemisphere Fatima Cream sliced pebble mosaic tiles. The shower tile was grouted using Laticrete Bright White grout.

Days 9 & 10 – The countertop installation team arrived to install the Bedrosians Sequel Boston Shores quartz tops with a mitered edge at the vanity and tub deck.

Days 11 & 12 – The painters began preparing and priming the vanity cabinets.  Using a high-grade, oil-based primer, every inch of the bathroom vanity cabinets were caulked, sanded and primed.  This is the first (and perhaps most critical) step of creating a durable paint finish. The painters then applied two coats of Kelly-Moore Dura-poxy paint in Swiss Coffee to the thoroughly sanded and primed vanity cabinets.  This same priming and painting process was used on the doors and drawers, which are painted off-site in a climate-controlled paint booth for the highest possible quality.

Days 13 & 14 – The transformation hit the homestretch with the installation of the freshly painted cabinet doors and drawers, the Kohler Archer sinks in white, the Kohler Memoirs widespread faucets, tub faucet, and shower fixtures, all with a brushed nickel finish and the Kohler Highline toilet. The mirrors, accessories and new frameless shower door were installed and the bathroom was cleaned of all construction debris and dust.

Bathroom Technical Details

Excited to Start on the Bathroom Renovation of Your Dreams? So Are We!

Perhaps the Rohde Drive bathroom reminds you of your bathroom.  Perhaps you like the layout of your bathroom and the cabinets are in good condition, but you are ready for a completely new look and feel. BathCRATE can make this happen in just a few days and for an amazingly low price.

Just click here to schedule your phone consultation using our online scheduling system.  Or feel free to call us direct during business hours at 888-995-7996!

Scott Monday is co-founder and CEO of kitchenCRATE and bathCRATE. Follow him on Facebook or Linked-In.

Does this project make you curious if bathCRATE is right for you?  Want the latest bathCRATE projects, news and discounts delivered directly to your inbox? Simply click the button below!

bathroom renovation blog.

Get design inspiration, remodel tips, and more.

You have Successfully Subscribed!